(2) In the event that SDC C applies and the enclosure(s) in question is “unimportant (i.e., Ip = 1.0 per ASCE 7),” then the enclosure(s) is seismically exempt (per ASCE 7 para. Two Notes: (1) Hilti KB-TZ2 may be directly substituted for TZ in this detail. NOTE: If the MCC is “unimportant (i.e., Ip = 1.0 per ASCE 7)” and being installed as part of a new- or existing-building project in which the seismic design of the building is based on SDC C, then the MCC is seismically exempt (per ASCE 7 para. Housekeeping Pad to Existing Slab Anchorage MOTOR CONTROL CENTER ANCHORAGE (INTERIOR) Metal Stairs - General Notes Optional Use Tie-down quantities Considering Topographic Factor Single Wide Trailer Requirements for In-Situ Soilįoundation Support System for Temporary Trailers-double wide Structural (Chapter 5) POC: Michael Denlinger, ES-EPD, 667-6572 Suggestions (LANL ONLY use IE)įOUNDATION SUPPORT SYSTEM FOR TEMPORARY TRAILERS On-Building Identification Letters and Detailīuilding Identification Plaques and Detail STANDARD DETAILS-G2040 EXTERIOR WAYFINDINGįacility Complex Identification Sign and Detailįreestanding Building Identification Sign and Detail Gas Piping Tie-In, PE Service Line to PE MainĪrchitectural (Chapter 4) POC: Scott Richardson, ES-EPD, 606-0596 Alt: TBD Suggestions (LANL ONLY use IE) Gas Piping Tie-In, PE Service Line to Steel Main Gas Piping Tie-In, Steel Service Line to Steel Main Water Piping Shut-Off Valve, for Fire Line (PIV) Water Piping Shut-Off Valve, 4" - 12" Line Size At each tier, we thoroughly check the construction to make sure it is steady and safe to use. Following the drawings, our installers erect the scaffold structure, carefully attaching it to your house. Water Piping Tie-In, 4" - 12" Service Line This is the most visible part of our residential scaffolding services. Attend & contribute to health and safety training and briefs. Providing total Tonnage of required material to construct design scaffold. Accurate scaffolding man hours (erection / dismantling) corresponding to scaffolding drawing. Water Piping Tie-In, 3/4" - 2" Copper Service Line Awareness of Scaffolding components on all drawings (Conventional / System) Estimations. Parking Layout (Accessible and Motorcycle)įence- Smooth Strand Single or Double Gateīollard Sprinkler System Riser Detail - Backflow Preventer/Design Notes Ĭivil (Chapter 3) POC: John O'Brien, ES-UI, 606-0335 List of Complete Alternates Suggestions (LANL ONLY use IE) Sprinkler System Riser Detail - Dry Pipe Sprinkler System Riser Detail - Pre-Action Sprinkler System Riser Detail - Wet Pipe (Transportable)
EXTERIOR SCAFFOLD DRAWING PDF
The PDF files open with Adobe Acrobat.įire Protection | Civil | Architectural | Structural | Mechanical | Electrical | Instrumentation & Control |įire Protection (Chapter 2) POC: Todd Smith, ES-EPD, 665-3152 Alt: Scott McMurtrey, ES-EPD Suggestions (LANL ONLY use IE) Netscape users-right click on AutoCad icon and select "Save Target As" to save to your computer and then open.
You can also view the CAD drawings using Voloview. Here’s a fun example of photos taken to an object in the 3 main views, and the object in an isometric view by “dlister86” on Instagram.NOTE: To open DWG.
Doesn’t matter if it’s a small object or a big object or vehicle, it’s totally up to you! My recommendation is that you start with a small object with fewer details, and then you can draw a bigger orthographic projection later on. The process is very simple, here’s what you need to do: Ready to start drawing your own orthographic projections? Then let’s do this.
EXTERIOR SCAFFOLD DRAWING HOW TO
#f1inschoolsmalaysia #f1inschoolsindia #f1inschoolsuk #F1inSchools #tos #TimeOfSports #f1inschoolsaustralia #LetsDrive #f1 #formula1 #f1inschoolsbrazil #f1inschoolsmexico #Racing #Fast #Speed #Quick #Orthographic #follow4followback #follow4follow #like4likeĪ post shared by Team INCATUS on at 11:54pm PST How To Draw An Orthographic Drawing